Astro Epoxy

Warehouse & shop floor coatings · Greater Houston

Keep the Operation Moving. Build Around the Work.

Your facility does not need a generic “industrial epoxy.” It needs a floor plan built around traffic, cleaning, exposure, concrete condition, safety needs, and the time available to install it.

Greater Houston 713-485-9889
Clear grind-and-seal floor installed by Astro Epoxy at Fire Station Number 1
Fire Station #1 · Astro project
Metallic floor installed by Astro Epoxy in a commercial warehouse studio
Hugo Studio · Warehouse / studio

Start with the operation

What Does the Floor Need to Accomplish?

The right system follows the work. Astro maps the facility's priorities and problem areas before narrowing the coating direction.

Keep the Operation Moving

Plan preparation, installation, cure windows, access, and phased return to service before work reaches the floor.

Plan for this outcome

Match the Workload

Account for foot traffic, pallet jacks, forklifts, service vehicles, rolling equipment, and concentrated work zones.

Plan for this outcome

Make Cleanup More Manageable

Choose a finished surface around the facility's dirt, water, oils, cleaning routine, texture, and maintenance expectations.

Plan for this outcome

Solve the Existing Floor First

Document old coatings, contamination, moisture history, cracks, joints, patches, and damage before selecting a new system.

Plan for this outcome

Warehouse and shop use cases

Map the Floor by Work Zone.

A loading path, service bay, wash area, and employee corridor do not experience the same floor. Separate the facility by what happens there before trying to make one specification cover everything.

Warehouse, Storage & Distribution

Operating pressure

Pallet traffic, staging, turning, loading paths, dust, and rolling loads

Plan before specifying

Map traffic lanes, rack locations, expansion joints, loading doors, charging areas, and the shutdown sequence.

Fabrication, Maintenance & Workshop

Operating pressure

Tools, dropped parts, benches, fabrication residue, oils, and concentrated wear

Plan before specifying

Separate general work areas from the places with impact, sparks, heat, chemicals, or repeated repair activity.

Vehicle, Service & Detailing Bays

Operating pressure

Tires, vehicle fluids, wash activity, lifts, jacks, and tracked-in grit

Plan before specifying

Review bay use, drains, slopes, wet cleaning, tire contact, lift locations, detailing chemistry, and return-to-drive timing.

Light Manufacturing & Back of House

Operating pressure

Production flow, carts, washdown, work cells, utilities, and changing layouts

Plan before specifying

Define each process zone, exact exposures, cleaning method, temperature events, equipment footprint, and future changes.

Industrial floor preparation

The New Floor Starts With What Is Already There.

A coating cannot correct an unknown substrate by itself. The useful scope identifies what must be removed, repaired, tested, protected, and kept functional.

Existing Surface

Identify paint, epoxy, sealer, adhesive, oil, tire residue, curing compounds, dusting concrete, weak repairs, and other bond risks.

Concrete Conditions

Document moisture history, cracks, control and moving joints, spalls, patches, slope, drains, low areas, edges, and transitions.

Mechanical Preparation

Define coating removal, grinding or other specified preparation, dust control, repair assumptions, test areas, and acceptance before installation.

Planning for downtime

Return to Service Is a Sequence, Not a Single Number.

“Ready” can mean ready for foot traffic, racks, pallets, rolling equipment, parked vehicles, process chemicals, or full production. Define which one matters, then work backward through cure conditions, equipment moves, inspections, cleaning, and phased access.

  • Occupied or fully cleared facility
  • One shutdown or phased zones
  • Working hours and noise limits
  • Loading doors and crew access
  • Equipment removal and return
  • Required traffic at each milestone

From site review to turnover

A Commercial Floor Plan You Can Schedule.

The proposal should connect the selected finish to the actual work required to deliver it.

  1. 01

    Map the Facility

    Mark pedestrian routes, wheeled traffic, work cells, loading areas, wet zones, chemical zones, drains, doors, racks, and equipment.

  2. 02

    Evaluate the Concrete

    Review the existing coating, bond, contamination, moisture history, cracks, joints, patches, edges, flatness, and transitions.

  3. 03

    Match Each Zone

    Choose system direction, texture, color, sheen, markings, cove or transition details, and repair assumptions around the zone's use.

  4. 04

    Build the Shutdown Plan

    Sequence clearing, preparation, installation, cure windows, inspections, equipment return, traffic return, and any phased turnover.

  5. 05

    Install & Close Out

    Complete the written scope, confirm return-to-service timing, and review care, maintenance, limitations, and warranty terms.

Verified Astro installations

Operational Floors, Real Astro Work.

These projects show two different commercial directions. They are proof of Astro's installation work—not a claim that one system fits every warehouse or shop.

Need a Subcontractor or Bid Partner?

General contractors, builders, property teams, and facility partners can send plans, finish intent, schedule constraints, and site details through Astro's contractor workflow.

Contractor Partnerships

Before the warehouse site review

Warehouse & Shop Floor Coating FAQs.

Direct answers for owners, facility managers, operations teams, and contractors comparing a Houston concrete-flooring project.

What is the best warehouse or shop floor coating?+

There is no universal best coating. Grind-and-seal can fit a concrete-forward, practical space; solid-color resinous floors support zoning and a controlled appearance; flake helps visually soften everyday marks; quartz is a strong texture-led direction; and specialty systems are evaluated when exact chemical, thermal, impact, or schedule demands require them. The concrete and operation decide the final scope.

How much downtime should a warehouse floor coating require?+

Downtime depends on removal, repairs, preparation, system layers, temperature, humidity, access, cure conditions, and the traffic returning to the floor. Astro builds a project-specific sequence and can evaluate phasing; a one-day promise should not replace a site plan.

Can you coat a floor with old epoxy, paint, adhesive, or oil on it?+

The existing surface must be identified and tested before it becomes part of a new scope. Weak coatings may require removal, and oil or other contamination can interfere with bond. Mechanical preparation, cleaning, test areas, repairs, or a different recommendation may be necessary.

Will the floor handle forklifts, pallet jacks, lifts, or service vehicles?+

Those loads belong in the specification, but no floor should be described as equipment-proof. Wheel type, loading, turning, impact, braking, hot tires, maintenance, slab condition, system build, and cure time all affect performance. Share the actual equipment and traffic pattern during the site review.

Are epoxy floors chemical resistant?+

Chemical resistance is specific, not universal. Provide the chemical or product name, safety data sheet when available, concentration, temperature, expected contact time, frequency, and cleanup method. The recommendation should then be checked against current manufacturer documentation for the complete system.

Can the floor be made less slippery?+

Texture can be adjusted by zone, but water, oil, footwear, slope, drains, cleaning method, wheeled traffic, and desired cleanability all influence the choice. More texture can also change how a floor cleans and how wheels move. No finished floor is presented as slip-proof.

Can you add safety lines, walkways, or work-zone markings?+

Yes, markings and color fields can be planned with the coating scope. Provide a current layout showing traffic lanes, pedestrian paths, staging, equipment clearances, restricted areas, and any standards your facility follows so placement and colors can be reviewed before installation.

What happens to cracks, control joints, and moving joints?+

They are documented and addressed according to the agreed scope and expected movement. Some cracks can be repaired or detailed, while active or designed joints may need to remain functional. Concrete can continue to move, so the proposal should explain both the treatment and its limitations.

What should I send for a useful warehouse floor estimate?+

Send the project address, approximate dimensions or plans, wide photos, close photos of damage and contamination, current floor type, equipment and traffic, cleaning routine, known exposures, operating hours, access limits, desired zones or markings, and target completion date. A short walkthrough video is often useful too.

Houston warehouse & shop project request

Give Us the Operating Picture.

Send the floor, the work, and the schedule—not just the square footage. Astro will help narrow the system direction and next site-review questions.

Start with the project

What does your floor need to do?

You do not need to know the coating system. Astro will narrow that after reviewing the space and the result you need.

Property type

Where should we send the recommendation?

Photos (optional)

Up to 6 images, 5 MB each and 20 MB combined. Photos are stored privately and only visible to the Astro team.

Or call 713-485-9889

Starting prices only — not a quote. Final pricing depends on slab condition, preparation, repairs, design, access, and project requirements.

Call Start Project